The Construction division is responsible for the design and development of all new schools.  Also the construction division is responsible for renovations, additions and portable moves.

General Inquiries:  905-335-3665 x3253

Manual for School Construction in Ontario

Recently an expert panel of senior staff from numerous Boards across the Province representing Public, Catholic, French Public and French Catholic and hundreds of years of experience assisted the Ministry of Education to develop a manual to assist personnel at school boards involved in capital construction projects.

This manual is a useful tool for everyone to understand the steps and leading practices involved in new school construction and renovation projects.

The manual addresses 4 key phases of construction:

  1. Pre-Design
  2. Pre-Tender
  3. Contract Preparation and Tender
  4. Construction

Link to:  Leading Practices Manual For School Construction in Ontario.July 2010

Construction Project Timelines:

Our new construction projects follow an established time line. Many of the steps along the way are dictated by: Ministry of Education approvals, Ontario Building Code requirements, municipal planning approvals and public consultation.  The below schedules are based on the ideal timing for approvals.  However if there is a delay at any step in the process it may delay the project completion.  The schedules may be modified due to the addition or deletion of approval, requirements etc. 

Please note that these are large documents and have been formatted for 11x17 paper for legibility.

Typiclal Elementary School Construction Schedule

Typical Seconday School Construction Schedule

 Projects:

There are a number of projects approved by the Board that are currently underway.

 New School Construction Underway

 Size (Pupil Places) Location Detail Pictures/Drawings
Craig Kielburger Secondary School  1200 Milton (4th Line and LSL) 9-12 High School See Downloads
Garth Webb Secondary School 1200 West Oak Trails Blvd. 9-12 See Downloads
SRA101 (Burlington NE) 1200 with joint uses, pub. library and comm. centre Tim Dobbie Dr. and Dundas St. 9-12 plus, pub. library, and comm. centre See Downloads
Alton Village PS 704 Burlington JK-8 See Downloads

 Additions Underway

 Size (Pupil Places)

 Location  Detail Pictures/Drawings
Maple Grove PS 248  Oakville  Addition See Downloads

  

 

Projects In Planning Stage Size (pupil places) Location Detail Pictures/Drawings
ERA120 (Milton) 741 SE Milton (see downloads for a location map) JK-8  School See Downloads. Awaiting tender results to start construction. This is a repeat design of Palermo PS

 

Recently Completed Projects Size (pupil places) Location Detail
Sunningdale PS 46 Oakville Addition and Renovations complete
C. R. Beaudoin 230 Burlington Addition
Munn's PS 184 Oakville 4 Classrooms 4 Specialty Rooms, 2 change rooms and renovations
Tiger Jeet Singh PS 704 Milton JK-8
James W. Hill PS 506 Oakville JK-8
Palermo PS 704 Oakville JK-8
Georgetown District HS Halton Hills (Georgetown) Addition, renovations adn artificial athletic field
Gardiner PS 60 Halton Hills (Georgetown) Addition
New Central PS 89 Oakville

2JK/SK rooms, 2 classrooms

John W. Boich PS 704 Burlington JK-8

 

FULL DAY KINDERGARTEN -

YEAR 3 SITES AND PROJECTS

 School  Municipality Project Type Occupancy Year
 Rbt. Little PS  Acton 2 classroom reno 2011
Harrison PS Georgetown 2 classroom reno 2012
Jos. Gibbons PS Georgetown 1 classroom reno. 2012
Park PS Georgetown 2 classroom reno 2012
Silver Creek PS Georgetown 3 classroom addn. 2012
Chris Hadfield PS Milton  3 classroom reno 2012
Martin Str. PS Milton 1 classroom reno 2012
Rbt. Baldwing PS Milton 2 classroom reno 2012
Cpt. R. Wilson PS Oakville 2 classroom addn. 2012
Eastview PS Oakville 2 classroom reno. 2012
Gladys Speers PS Oakville 4 classroom reno. 2012
Post's Corners PS Oakville 3 classroom addn. 2012
River Oaks PS Oakville 3 classroom addn. 2012
B.T. Lindley PS Burlington 1 classroom addn. 2012
Flo. Meares PS Burlington 2 classroom addn. 2012
Glenview PS Burlington 3 classroom reno. 2012
J.T. Tuck PS Burlington 1 classroom reno 2012
Maplehurst PS Burlington 2 classroom reno 2012
P.A. Fisher PS Burlington 1 classroom reno 2012
Ryerson PS Burlington 3 classroom reno 2012
Unique Projects:

New Alton Community High School and Joint Use Facility 

Design of the new high school, community centre and library are complete, please see downloads. 

The City of Burlington is reviewing the site plans for approval.  The City of Burlington has issued a site alteration permit. This permit allows for the grading and elevation work to commence.

The project is expected to be out for tender in the new year.  Once the tenders have been received, Halton District School Board Staff and Ministry of Education staff must review the documents.  The Board will then consider the tender bids for approval .  This approval is expected in March.  This will enable a spring start for construction. 